Laserfiche WebLink
PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />Replace in the third paragraph, last sentence "3 inches" wiih "1 inch". <br />CIP N0. 3-0-003-09 <br />PROJECTNO. <br />PD•WM-20005-01 <br />Topsoil Analysis: Fumish soil analysis by a qualified soil-lesting laboratory stating percentages oi <br />organic matter; gradation ot sand, silt, and clay content; cation exchange capacity; deleterious material; <br />pH; and mineral and plant-nutrient content of topsoil. <br />Soil-Testing Laboratory �ualifications: An independent laboratory, recognized by the State Department <br />of Agriculture, with the experience and capability to conduct the testing indicated and thal specializes in <br />types of tests to be performed. <br />Report to the Engineer the suitability of topsoil for plant growth. State 2commended quantities of <br />nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce a saGsfactory <br />topsoil composition. <br />Seclion 8-02.3(8) Planting is ame�ded with the foliowing: <br />Repiace the fifth paragraph with: <br />Pits and Trenches: Excavate circular pits with sides sloped.imGard. Tr�m base leaving center area <br />raised slightly to support root bali and assist in drainage. �Do not further disturb base. Scarify sides of <br />plant pit smeared or smoothed during excavation. . <br />Subsoil removed from excavations may not be used as backfill. , <br />— ! �___— <br />Obstructions: Notify Landscape Architect if unexpecle"d�'ocK'or-otsstnletlons'detAmeniai�to tf�es or <br />shrubs are encountered in excavations. <br />Harclpan Layer: Drili 6-inch-diameter holes into free-draining strata or to a depth of 10 feet, whichever <br />is less, and backfill with (ree-draining materiaL `',� <br />Drainage: Notify Landscape Architect if subsoil conditions�evidence unexpected water seepage or <br />retention in tree or shrub pils. <br />Fill excavations with water and allow to percolate away before posifio ' g trees and shrubs. <br />Replace the eighth paragraph with: <br />Remove all burlap and wire baskets completely irom root balls. Remove pallets, if any, before setting. <br />Do not use planting stock if root ball is cracked or hroken before or during planting operation. <br />Section 8-02.3(10) Fertilizers is supplemented wilh the following: <br />Siow-Release Fertiiizer. Granular or pelleted fertilizer consisting of 50 percent water-insoluble nilrogen, <br />phosphorus, and potassium in the following composition: <br />Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from a <br />qualified soil-testing agency. <br />Page 33 of 50 <br />