My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />8-20 ILLUMINATION TRAFFIC SIGNAL SYSTEMS AND ELECTRICAL <br />Description <br />Section 8-20.1 is supplemented with the following: <br />CIP N0. 3-0-003-09 <br />PROJEGTNO. <br />PD-WM•20006-07 <br />This specification covers work related to the new illumination system on West Marine View Drive. <br />Materials <br />Equipment Llst And Drawings <br />Section 8-20.2(1) is supplemented with the following: <br />Manufacturers data for materials proposed for use in the contract which �equire approval shall <br />be submitted in one complete package. <br />Conduit <br />Section 9-29.1 is supplemented with the following: <br />(NWR October 31, 2005) <br />Cabinet Conduit Sealing <br />Mechanical plugs for cabinet conduit sealing shall be one of the following: <br />1. Tyco Electronics - TDUX <br />2. Jackmoon — Triplex Duct Plugs <br />3. 0-Z Gedney — Conduit Sealing Bushings <br />installation shall coniorm to the manufacturers recommendations. <br />(NWR February 22, 2005J <br />Junction Boxes <br />Section 9-29.2 is supplemented with the fallowing: <br />Junction boxes installed for future use, which are not yet part of an illumination, signal, <br />interconnect or ITS system shall not be labeled. <br />Light And Signal Standards <br />Decorative Light Standards <br />Seclion 9-29.6(1)A is replaced with the following: <br />Light Standards and Luminaires shall be as specified in the plans. <br />Approvals: <br />Shop drawings shall be approved by the Engineer prior to pole fabrication. <br />Page 39 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.