Laserfiche WebLink
•:.�:, - <br />:ti;'•' <br />. .,, <br />'..j� <br />�� � A;.� <br />�i�' <br />� <br />EVERETT CITY COUNCII. AGENDA ITEM COVER SIiEET 1 S <br />�S�*s - �raa�. <br />PROJECT TITLE: L S <br />Authorize the Mayor to sign a professional <br />services agreement with HDR Engineering <br />for Lift Stadon �7 and #8 up�ade <br />LOCATION: <br />14th and Grand and 14th and W. Marine <br />View Dr. <br />Prneding Action: <br />Feb. 12,1997: City Council authorized <br />Public Works to negotiate an agreement <br />with HDR Engr. <br />Aug. 16, 1995: Ciry Council authorized <br />the Mayor to sign an interlocal agreement <br />with the Port of Everett. <br />Attachments: • <br />Pmposed professional services agreement. <br />Mo/'i �12 �/ie.u� Uf <br />I 4 �` St <br />Initialed by: <br />Depaztment Head <br />CAA <br />Council President <br />COUNCII. BII.L # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />�, <br />Public Works <br />Dan Mathias <br />257-8855 <br />5/28/97 <br />Consent <br />X Action <br />First Reading <br />Department(s) Approval (Identify): <br />Public Works <br />Second Reading <br />Third Reading <br />Public Hearing <br />SUMMARY STATEMENT: <br />Lift stations �7 and #8 will be upgraded to pump stormwater from the Port of Everett to the water pollution <br />control facility and to reduce the frequency of combined sewer overflows at lift station to an average of one <br />eveat per year. Per an interlocal agreement between the City and the Port of Everett, the Port will reimburse <br />the City for 100% of the cost of the lift station #7 upgrade and approximately 30% of the cost of the lift <br />station �8 upgrade. <br />RECOIV�'IENDATION (Esact actian reauested of Council): <br />Authorize the Mayor to sign the professional services agreement with HDR Engineering. <br />LS78agen <br />� <br />