My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�,='-�{ : <br />�a <br />�:�:� <br />15 <br />IV. TASK 4: BIDDING ASSISTANCE <br />jtaoonsibilides of En '�neer <br />1. Provide one (1) set of bidding documents for reproduction by City (contact <br />manual will include 11" x IT' plaas bound in docummt). <br />2. Respond to bidder questions during 3 week bidding period inclndinB lssuinB of <br />any addenda required. (The Ciry will make distribution of any addenda). <br />3. <br />4. <br />5. <br />6. <br />Attend Pmbid Conference. <br />prepare construcr.on cost esdmate. <br />Review contractor bids and make recommendation for awazd. <br />Rebidding of the project as a result of a bid protest is not included in this scope of <br />work. <br />�tesp,onsibilities of Owner <br />1. Provide reproduction of Con�act Documenu. <br />2. Adverti�e construction contract. <br />3. Provide for distribuuon of the Con�act Documents. <br />4. Maintain Plan Holders List. <br />5. Make distribution of any Addenda. <br />6. Hold Prebid Conference. <br />VI. TASK 5: CONSTRUCTION MANAGEMENT <br />(To be negotiated after completion of Tasks 1-3) <br />VII. TASK 6: SUPPLEMENTAL SERVICES <br />Provide additional engineering services required as directed by the Owner. Prior to <br />implementation of these services, authorization must be received &om the Owner. This <br />authorization will include approval of the additional scope of work and the related <br />budget. <br />May 14. 1997 <br />A-4 L� Sration Nar. �& 8 Upgradu <br />: <br />
The URL can be used to link to this page
Your browser does not support the video tag.