Laserfiche WebLink
� 15 <br />IV. TASK 3: PREPARATION OF CONTRACP DOCUIV�NTS <br />'ihis taslc will include the preparation of Contract Documenis for bidding the construction <br />of the liR station upgndes and will include the following: <br />1. 50% Design <br />a. Prepare 50% review drawings. <br />b, prepare 50% contract specifications. <br />c. Preliminary drdwinB estimate is as follows: (See Attachment 1 for detailed <br />drawing list) <br />Discioline <br />Geneml <br />Civil <br />Structural <br />Architectural <br />Mechanical <br />Electrical <br />d. Drawing size to be 22" x 34". <br />e. Utilize Ciry's general conditions <br />specifications based on CSI format. <br />f. Attend review meeting. <br />�Io. of Dw¢s. <br />3 <br />6 <br />5 <br />� <br />4 <br />4 <br />for specificatioas, �vith technical <br />2, 100% Design <br />a. Prepare 100% review drawings. <br />b. Prepaze 100% con�act specifications. <br />c. Attend review meeting. <br />d. Incorporate comments <br />e. Submit bidding set of conuact drawings. <br />f. Sub¢ut bidding set of conhact specifications. <br />Raoonsibilitv of Owner <br />1. Attend 50% and 100% review meedngs. <br />Taak Deliverables <br />1. 50°/a Contract Documenis - 8 copies_ <br />2. 100% Contract Documents - 8 copies <br />3. Bidding Documents - 1 copy + originals <br />� <br />May 14, /997 A-3 L h Station Nos. 7& 8 Upgradu <br />