My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�RAFr <br />May 28, 1997 <br />; ��i .r : ; : • .r r �� _ : <br />� <br />Moved by Councilmember Overstreet, seconded by Councilmember <br />Campbell to authorize t6e Mayor to sign a professional services agreement <br />with Heartland Group for the Everett Riverfront Study Area for an amount <br />not to exceed $90,000. <br />Roll was called with all councilmembers voting yes. <br />� yvc� t,�. .�ar�� �er��1�c,� �Lt.. <br />LS 7 r <br />Cc�O .�7��. Ls#g I aaa �y�+�-: �r <br />4. F M*1T - iFT ST.4TiONS 7& 8 i m�,R anFc <br />Moved by Councilmc,mber Overstreet, seconded by Councilmember Hansen <br />to authorize the Mayor to sien � professional services asreement with HDR <br />Engineerine for Lift stations #7 and #8 upgrades. <br />Lift stations �7 and R;i will be upgraded to pump stotmwater from the Port of <br />Everett to the water pollution control faciliry and to reduce the frequency of <br />combined sewer overfluws at the lift station to an ave�age of one event per yeaz. <br />Per an interlocal agreement between the City and the Port of Everett, the Port will <br />reimburse the City for 100% of the cost of the lift station #7 upgrade and <br />approximately 30% of the cost of the lift station R8 upgrade. <br />Roll was called with all counciimembers voting yes. <br />Motion carried. <br />269 <br />
The URL can be used to link to this page
Your browser does not support the video tag.