My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />EVERETT C1TY COUNCII. AGENDA 1TEM COVER SFIEET <br />w.o. a�a�- 16 <br />LS *� 7- I 4 ov W!►1ar i v�c., V i e,w p� <br />PROJECT TTTLE: �5'� a- r aa� ►y � st <br />Collection System Odor Controi Improvemenu �ti�� by: <br />Design Connact Department Head q� <br />CAA <br />Council President <br />LOCATION: <br />l) Shadowood Drive <br />2) Lowell Road <br />Pmeding Action: <br />6-21-95 Authorized Study by HDR <br />12-27-95 Authorized Design by HDR <br />11-20-96 Authorized construction at <br />WPCF <br />Attachments: Amendment �2 <br />COUNCII. BII.I. # <br />Origiaating Department <br />Contact Person <br />Phone Numba <br />FOR AGE�IDA OF <br />Utilities <br />Tim Mazks i 1 <br />259-8872 <br />May 28. 1997 <br />Consent Second Reading <br />XX Action Third Reading <br />First Reading Public Hearing <br />Department(s) �pproval (Identify): Utilities <br />SUMIVL�.RY STATEbIENT: <br />HDR Engineering, Inc. completed a study of the odor problems in the collection system and at the WPCF. <br />As a result of the study HDR designed improvements for collection and u�eatment of odor at the WPCF. A <br />cons�uction contract has been issued and is in progress to construct these facilities at the WPCF. Utilities <br />now needs to implement the recommendations made in the HDR study to reduce odor released from the <br />�ollection system. HDR is prepared to design and provide consuvction support for two cazbon filters. One <br />system will bA construr.ted at the north end of Shadowood Drive and the second system will be constructed <br />on Lowell Road near Gale Place. <br />RECONII�IENDATION: <br />Utilities recommends t,4at the City Council authorize the Mayor to si� Amendment �Io. 2 to the Professional <br />Services Agreement benveen the City of Everett and HDR Engineering dated December 20, 1996. <br />SO <br />
The URL can be used to link to this page
Your browser does not support the video tag.