My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- - --- -- --- � . . <br />� <br />� <br />; . . <br />� <br />�RAFr <br />May 28, 1997 <br />: utp►1 : : : � ►� l 1� . : <br />Moved by Councilmember Overstreet, seconded by Councilmember <br />Campbell to authorize the Mayor to sien a professional services aereement <br />with Heartland Group for the Everett Riverfront Study Area for an amount <br />not to exceed 590,000. <br />Roll was called with all councilmembers voting yes. <br />�-c��% . 7 � �, L'' # I < </OC� l�%. !11�t�'�' /�gr� ��i ez1J ��/L <br />� L S 8 I� a a � �I�"t.r 5� <br />AGR_FEVtEVT - LIFT STATIONS 7& 8 tiPrg,�pp,�. <br />hioved by Councilmember Overstreet, seconded by Councilmember Hansen <br />to authorize the i�iayor to sien a professional services agreement with iIDR <br />Engineerine for Lift stations �7 and �8 uperades. <br />Lifr stations N7 and R8 will be uperaded to pump stormwater from the Port of <br />Everett to the water pollution control faciliry and to reduce the frequency of <br />combined sewer overflows at the lift station to an average of one event per year. <br />Pec an interlocal agreement between the City and the Port of Everett, the Port will <br />reimburse the City for 100% of the cost of tt,e liR station #7 upgrade and <br />approximately 30% of the cost of the lift station n8 upo ade. <br />Roll was called with all councilmembers voting yes. <br />269 <br />Motion c�rried. <br />
The URL can be used to link to this page
Your browser does not support the video tag.