My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />' <br />' <br />� <br />1 <br />� <br />� <br />PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />CIP N0. 3-0-003-09 <br />PROJECTNO. <br />PD•WM•20006-01 <br />in order to prevent the HMA mixture from adhering to the hauling equipment, truck beds are lo <br />be sprayed with an environmentally benign release agent. Excess release agent shall be <br />drained prior to filling hauling equipment with HMA. Petroleum derivatives or other coating <br />materials that contaminate or alter the characteristics of the HMA shall not be used. For hoppei <br />trucks, the conveyer shall be in operation during the process o( applying the release agent. <br />5•04.3(3) h�f Mix Asphalt Pavers <br />HMA pavers shall be sel(-contained, power•propelled units, provided with an intemally-heated <br />vibratory screed or strike•off assembly and shall be capable of spreading and finishing courses of <br />HMA plant mix material in lane widths required by the oaving section shown in the Plans. <br />The screed or strike-off assembly shall effectively produce a finished surface of the required <br />evenness and texture without tearing, shoving, segregating, or gouging the mixture. Extensions <br />will be allowed provided they produce the same results, including ride, density, and surface <br />texture as obtained by the primary screed or strike off assembly. Extensions without, augers, <br />vibration and heated screeds shall not be used in the traveled way. <br />When laying HMA, the paver shall be operated at a unifortn forward speed consistent with the <br />plant production rate and roller train capacity to result in a continuous operation. The auger <br />speed and flight gate opening shall be adjusted to coordinate with the operation. <br />The paver shall be equipped with automatic screed controls with sensors for either or both sides <br />of the paver. The controls shall be capable of sensing grade from an outside reference line, <br />sensing the transverse slope of the screed, and providing automatic signals that operate the <br />screed lo maintain the desired grade a�d transverse slope. The sensor shall be constructed so it <br />wili operate from a reference line or a mat referencing device. <br />The transverse slope controller shall be capable of maintaining the screed at the desired slope <br />within plus or minus 0.1 percent. The paver shall be equipped with automatic feeder controls, <br />properly adjusted to maintain a uni(orm depth of material ahead �f the screed. <br />Manual operalion of the screed will be permitted in the construction of iRegulariy shaped and <br />mir�or areas. These areas include, but are not limited to, gore areas, road approaches, tapers <br />and left-tum channelization. <br />When specified in the conlract, reference lines for vertical control will be required. Lines shall be <br />placed on both outer edges of the traveled way of each roadway. Horizontal control uGlizing the <br />reference line will be pemiitted. The grade and slope for intermediate lanes shall be controlled <br />automatically from re(erence lines or by means of a mat referencing device and a slope control <br />device. When the finish of the grade prepared for paving is superior to the established tolerances <br />and when, in the opinion of the Engineer, further improvement to the line, grade, cross•section, <br />and smoothness can best be achieved without the use of the reference line, a mat referencing <br />device may be substiluted for the reference line. Substitution of lhe device will be subject to the <br />continued approval of the Engineer. A joint matcher may be used subject to the approval of the <br />Engineer. The reference line may be removed after the completion of lhe first course of HMA <br />when approved by the Engineer. Whenever the Engineer detertnines that any of these methods <br />are failing lo provide the necessary vertical control, the reference lines will be reinstalled by the <br />Contractor. <br />Page 10 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.