My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />� <br />� <br />PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />CIP NO. 3-0-003-09 <br />PROJECTNO. <br />PD-WM-20006-01 <br />The Contrar,tor shall furnish and install all pins, brackets, tensioning devices, wi2, and <br />accessorie� necessary for satisfactory cperation of the automatic control equipment. <br />If the pavir,a machine in use is not providing the required finish, the Project Engineer may <br />suspend work as allowed by Section 1-08.6. Any cleaning or solvent type liquids spilled on the <br />pavement shall be thoroughly re��ioved before paving proceeds. <br />5-04.3(4J Rollers <br />Rollers shall be of the steel wheel, vibratory, or pneumalic tire type, in good condition and <br />capable of reversing without backlash. Operation of the roller shall be in accordance with the <br />manufacturers recommendations. When ordered by the Project Engineer tor any roller planned <br />(or use on lhe project, the Contractor shall provide a copy of the manufacturers recommendation <br />for the use of that roller for compaction of HMA. The number and weight of rollers shall be <br />sufficient to compact the mixture in compliance with the requirements of Section 5-04.3(10). The <br />use of equipment that results in crushiny of the aggregate will not be pertnitted. Rolleis <br />producing pickup, washboard, un•even compaction of the surface, displacement of the mixture or <br />other undesirable results will not be used. <br />5-04.3(5)B Preparation of Unheated Roadway <br />When designated in the plans the existing roadway shall be prepared and the roadway primed as <br />provided in Section 5-02.3(2)A, except that only one application of asphalt and one application of <br />aggregate, which shall conform to aggregate for HMA Class B as listed in Section 5-04.3(8) or <br />other granular materials approved by the Engineer, will be required. All other provisions of <br />Section 5-02 pertaining to bituminous surface treatment Class A shall apply, except as <br />hereinafter modified. <br />The prime coat shall be appiied over the full length of the project, and HMA shall not be placed <br />until lhe prime coat has cured for 5 days unless otherwise approved by the Engineer. <br />Should any holes, breaks, or irregularities develop in the roadway surface after the prime coat <br />has been applied, they shall be patched with HMA, as described in Section 5-04.3(5)�, in <br />advance of placing the HMA. The Contractor shall maintain the completed prime coat by bla�ing <br />or brooming with equipment and procedures approved by the Engineer, until the HMA pavement <br />is placed. <br />� A(ter the maintenance, patching or repair work has been completed and immediately prior to <br />placing the HMA, the surface of the prime coat shall be swept clean of all dirt, dust, or other <br />foreign matter. <br />� When ihe prime coat application is not specified in the Speciai Provisions or shown in the Plans, <br />the Contractor shall prepare the untreated roadway as described above and shall omit the prime <br />� coat treatment. The HMA shall be constructed on the prepared subgrade. <br />In areas used as tumouts or which will receive heavy service, the Engineer may order a change <br />� in the grade to provide a greater depth oi pavement. <br />Page 11 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.