My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1400 SEINER DR 2018-01-01 MF Import
>
Address Records
>
SEINER DR
>
1400
>
1400 SEINER DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 3:57:51 PM
Creation date
2/27/2017 6:21:15 AM
Metadata
Fields
Template:
Address Document
Street Name
SEINER DR
Street Number
1400
Notes
PORT INFRASTRUCTURE (Address changed from 1400 W Marine View Dr to 1400 Seiner Dr as of 9/2019)
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />PORT OF EVERETT <br />W MARINE VIEW DR <br />IMPROVEMENTS <br />CIP N0. 3-0-003-09 <br />PROJECTNO. <br />PD•WM•20006-01 <br />Removal of material from high places by grinding with an approved grinding machine, <br />or <br />2. Removal and replacement of ihe wearing course of HMA, or <br />3. By other method approved by the Project Engineer. <br />Correction of defects shall be carried out until there are no deviations anywhere greater than th� <br />allowable tolerances. <br />Deviations in excess of the above tolerances that result from a low piace in the HMA and <br />deviations resulting irom a high place where corrective action, in the opinion of the Project <br />Engineer, will not produce satisfaclory results will be accepted with a price adjustment. ihc <br />Project Engineer s`�II deduct irom monies due or that may become due to the Contractor the <br />sum of $500.00 for each and every section of single traffic lane 100 feet in length in which any <br />exc�ssive deviations described above are found. <br />When Portland cement concrete pavement is to be placed on HMA, the surface tolerence of the <br />HMA shall be such that no surface elevation lies above the plan grade minus th� specified plan <br />depth of Portland cement concrete pavement. Prior to placing the PoRland cement concrete <br />pavement, any such irregularities shail be brought to the required tolerance by grinding or other <br />means approved by the Project Engineer. <br />When utility appurtenances such as manhole covers and valve boxes are located �in the traveled <br />way, the roadway shall be paved before the utility appurtenances are adjusted to the finished <br />grade. <br />5-04.3(14) Planing Bituminous Pavement <br />The surface of existing pavements or lhe top surface of subsurface courses shall be planed to <br />remove irregularities and to produce a smooth surface. <br />Planing shall be performed in such a manner that the underlying pavement is not tom, broken, or <br />otherwise damaged by the planing operation. The surface of the underlying pavement shall be <br />slightly grooved or roughened sufficiently to ensure a bond when overlaid. <br />The pianings shall become the property of the Contractor and shall be removed from the right•of- <br />way. The planings may be utilized as RAP, within the requirements of Section 5•04.2 or 9•03.21. <br />The Contractor shall dispose of all other debris resulting from the planing operation in a <br />Contractor-provided site ofl the right-of-way. <br />For mainline planing operations, the equipment shall have automatic controls, with sensors ior <br />either or both sides of the equipment. The controls shall be capable of sensing the proper grade <br />from an outside reference line, or a mat-re(erencing device. The automatic controls shall also be <br />capable of maintaining the desired transverse slope. The transverse slope controller shall be <br />capable of maintaining the mandrel at the desired slope (expressed as a percentage) within plus <br />or minus 0.1 percent. <br />5-04.3(15) HMA RoadApproach <br />HMA approaches shall be constructed ai the locations shown in the Plans or where staked by <br />the Project Engineer. The worfc shall be perfortned in accordance with Section 5-04. <br />Page 24 of 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.