Laserfiche WebLink
PORT OF EVERETT SECTION 02371 <br />14TO STREET BULICHEAD REPLACEMENT TEMPORARY EROSION AND <br />SEDIMENTATION CONTROL <br />(3) Phase 1: Trenching only. <br />1.05 SUBMITCALS <br />A. <br />B. <br />C. <br />(4) Phase 2: <br />(a) Yeak ratc: 4.6 cfs <br />(b) Total vo�ume: 13,700 c.f. <br />(5) Phase 3: <br />(a) Peak rate: 5.1 cfs <br />(b) Total volume: 15,000 c.f. <br />(6) Phase 4E: <br />(a) Peak rate: 2.5 cfs <br />(b) Total volume: 7,400 c.f. <br />(7) Phase 4W: <br />(a) Peak rate: 1.56 cfs <br />(b) Total volume: 4,700 c.F. <br />Comply with Section 01300. <br />Product Submittals: Product catalog cuts for products in this section; silt fence, <br />protective orange fencing, filter bag inserts, and silt curtain. <br />Aggregate Materials: Coarse aggregate for gravel conswction entrance. <br />D. Treatment Train: Prior to performing any site clearing or stripping, submit letter <br />certifying system is designed to comply with perfortnance criteria. List system <br />selected and include list of system elements (for example, settling tanks, filters, <br />etc.) and maintenance mquirements. <br />E. Disposing of Silry Water Off Site (alternative to treatment train): Prior to <br />performing sit^ clearing or stripping, submit letter identifying equipment available <br />f or transport. List subcontractor, if used. List method of disposal. <br />CIP No. 2-0-002-01 <br />02371 - 3 <br />Project No. hiR-NM-2005-01 ^ <br />(�yJ <br />