PORT OF EVERETT SECTION 02371 <br />14�� STREET BULKHEAD REPLACEMENT TEMPORARY EROSION AND <br />SEDIII�NTATION CONTROL <br />5. Location shown on drawings is approximate field adjust to contain siltly <br />water and to minimize area restricted from use bv Port and tenants. <br />K. <br />Seal Storm Drain Outlet: <br />?, <br />3. <br />Provide temporary removable watertight seal to storm drain outlet pipe at <br />all pipes discharging to tide water and that will receive silt laden water. <br />Maintain water tight seal until risk of silt laden water entering tidewater is <br />past. <br />Inspection stormwater outfalls duily to verify seals are water tight. <br />Treatment Train: <br />1. Provide treatment system to filter silty H�ater before discharge into City <br />storm drain system. <br />2. Operate in accordance with manufacturer's recommendations. <br />3. Muintain system as required to sustain discharge water quality <br />requirements. <br />4. If treatment train does not produce water passing test noted below, provide <br />additional treatment or dispose of water off site. <br />Disposing of Silty Water Off Site (Altemative to Treatment Train) <br />Provide pumps and tanker trucks to load and haul silty water. <br />Provide for disposal of silty water. <br />3. Dispose of silty water in accordance with local, state, and federal codes. <br />3.04 FIELD QUALTI'Y CONTROL <br />A. Site Tests: Test stormwater runoff to verify compliance with City of Everett <br />Standards. If test indicates runoff is out of compliance, provide additional <br />measures to ensure compliance. <br />3. <br />CIP No. 2-0-002-01 <br />Test runoff water before beginning Work to establish background levels of <br />silt. <br />Test runoff Trom initial treated watcr discharge from treatment train into <br />storm drain system. <br />Test water at location do�vnstream at each stonndrain outfall. <br />02371 - 8 <br />Project No. MR-NM-2005-01 �, <br />I'l <br />