Laserfiche WebLink
� • 1 1 1 ' 1 <br />7'N 131ih titrcc� ti\V <br />Suitc ?IXI <br />Ercre�L W.1 9R?Ol <br />I'h:1?517JI-38IX1: Fa�:i�5/7a1-391N1 <br />To: <br />From: <br />Projcct: <br />Subject: <br />MEMORANDUM <br />Paul McKcc <br />City of Evcrcu, Public Works <br />Hugh Kuyper <br />Port of Evcrctt 14�h SL Bulkhcad Replacement <br />Response to City Revicw Comments <br />Filc No.: 24-02-009 <br />Datc: Feb. 22, ?005 <br />We received your e-mail (dated 7J1G/OS) with the review comments for the above project. The comments <br />(and your review) ure for the erosion conirol, grading, drainage, water, sanitary sewer, and paving. <br />Bclow is our response to your commenls: <br />1) The city notes for water and sewer are added to sheet C3.4 as rcquested. <br />2) The 15 foot wide easement for the public water main is shown as requested. <br />3) Sheet C4.1 — The pipe slope has been added between CBs 1& 2 as requested. <br />4) Sheet C4.2 — The pipe upslteam from CB 9 has been extended and realigned ro provide a straight <br />pipe to the up stream existing CB as requested. <br />5) Sheet C4.4 — Conceming the gap between the new concrete esplanade (walkway) and the extruded <br />asphalt curb, we request that the design be accepted as is. The reason is that this is a temporary� <br />condition. The extruded curb is used to protect Ihe north edge of the concrete esplanade. We expect <br />to replace all AC pavement within about 2 years. The new 14'" Strcet Marina parking lot will widen <br />the esplunade about 7 feet ro a total width of 20 feet. The new north edge of the esplanade will serve <br />as the curb at that time. The AC pavement and curb shown on these drawings will be ground and <br />used as base material. <br />G) Sheets CS.I through C5.3 — Conceming pavement hatching at parking smlls encumbered by light <br />poles. Parking stalls ulong north tier that are encumbered by light poles are hatched to show they are <br />not parking stalls. <br />Along the esplanade edge, we have retained the stalls for parking. Stall length from the proposed <br />whecl stops protecting light poles scale 19 feet. <br />7) Revised location for water meter and RPBA serving the marina: is shown on the corrected drawings <br />(at the east end of the bulkhead at station 5+90.) We are proposing I-2 inch metec We request you <br />approvc this configurati�n. Our logic is as follows: <br />Pagc I or2 <br />II�.\I�(�21\V�0'_10(N) I'on o(GrerclPNonh Slarina Itulkhea�!FINAL DESIGMCn�s�ndcnccmicm�� F'aul McKce 02220S.Joc 7r` <br />-r <br />