Laserfiche WebLink
�gh Kuyper - RE: Port of Everett 14th St. Bulkhead _ pa9e � <br />From: "Paul McKee" <PMckee@ci.everett.wa.us� <br />To: "Hugh Kuyper" <hkuyper@reidmidd.com> <br />Date: 2/16105 1:39PM <br />Subject: RE: Port of Everett 14th St. Bulkhead <br />Hugh, <br />First of ali - good plans. <br />The following are our comments on the BulkF.ead replacement project: <br />1. Please inciude our Required Notes on Plans from the City of Everett Standards Manual for both Sewer <br />and Water on the plan set. <br />2. Please show and note the 15' easements required for the public water mains. We can deal with the <br />actual easement docs later. <br />3. C4.1 - The pipe between CB1 & C62 needs slope caliout. <br />4. C4.2 - The pipe between C69 8 Existing either needs a CB at the change of alignment where it <br />connects to the existing pipe or to be relayed from CB9 all the way to the connection into the existing CB. <br />5. C4.4 - Section 'B' called out on sheet 4.3 is missing. <br />6. C4.4 - In section 'A' the gap between the wheel stop curb and the top of the sidewalk deck <br />appears to be a potential maintenance problem (garbage, dirt) and potentially a puddling problem (even <br />with the gaps in the curb) & trip hazard. If feasibie, I would recommend filling the gap to be flush with the <br />sidewalk deck or allowing the vehicles to overhang the sidewalk (extend sidewalk if necessary). <br />7. C5.1-05.3 - Please show hatching in parking stalls that are encumbered by light poles. <br />I have not seen the revision to the location for the connection from the City system to the Port's. Will there <br />be enough Flow (usage) to keep the proposed 6" �fresh'? <br />We at the City appreciate your willingness to meet, inform, explain and work with us on this project. <br />Thanks, <br />Paul McKee <br />City of Everett <br />425-257-8867 <br />—Original Message--- <br />From: Hugh Kuyper �mailto:hkuyper@reidmidd.com] <br />Sent: Wednesday, February 16, 2005 8:52 AM <br />To: Paul McKee <br />Subject: RE: Port of Everett 14th St. Bulkhead <br />Thanks. <br />We coordinated w/ Rick Robinson at the fire department concerning locating the fire hydrant at the east <br />end of the bulkhead reconstruction. He wants us to stay 10' east of the existing fire hydrant. <br />We are working on configuring that now. Also reducing the size of the meter. The new 6" private water <br />pipe serving the combined access piers 8 the docks is sized for a future marina. We don't need a 6" <br />meter now. <br />We sized a meter for a similar size mariria at Thea Foss water way in Tacoma. It is only 2" diameter. We <br />are comparing number of slips now and checking capacity. <br />HK <br />»> "Paul McKee" �PMckee@ci.everett.wa.us> 02/16I05 08:14AM »> <br />Hugh, <br />�4 <br />