Laserfiche WebLink
Mr. Paul McKee <br />Ciry of Everett <br />January 21, 2005 <br />File No. 242002.019 <br />Page 2 <br />2. Refer to the phasing plan sheets Pl.l, P2.1 through P2.4 of the contract <br />drawings for details of the phasing. <br />3. Refer to specification section 02371— Temporary Erosion and Sedimentation <br />Control, article 1.04 pazagraph A, subparagraph 3, attached, for peak flow rates <br />and total runoff volumes. <br />4. Refer to the calculations for a summary of the areas for each phase and the flow <br />rate and � .lume calculations. <br />Thank you for you: consideratio�Please advise us of <br />Sincerely,` <br />/ <br />Reid Middleton,Inc. <br />/� <br />�/ �� �����/ <br />Hugh N. Kuyper, P.E. / <br />Senior Engineer <br />( <br />� ��-��� /-�' <br />� <br />�Pl►'r�,✓� �. <br />a�� �. <br />G % �jUZC � <br />� 5 �-v <br />�� � � <br />�� Ca�'a`` <br />'� <br />kab:h�doc�24\02\009�final designkorrespondenceUtr P McKee Everett Ol I905.doc�hnk <br />Attachments <br />Reid iddleton <br />