My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1620 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1620
>
1620 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 10:18:25 AM
Creation date
2/27/2017 6:24:42 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1620
Notes
PED BRIDGE IS UNDER 1610 W.M.V.D.
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a I17,-'7-' 97 14: 1 A 1 D: CO nF FVEF'6TT Ft A11 TEL Nn: �ti6._,-'r9-374.? SS 1 tS4 r 1 <br />1 <br />v <br />24. Any gredingill on this site shall be done so as to not impact the surrounding <br />properties. <br />25. Special charges for connection to the sewer and water systems in accordance with <br />Ordinance 1171-85 and subsequent revision are applicable. These charges are <br />based on projected water usage and can be substantial. The Applicant is <br />encouraged to obtain a copy of the ordinance and determine estimated charges <br />prior to Building Permit application. The actual charges shall be computed by the <br />Public Works Department per the ordinance in effect at the time and according to <br />the information on the approved plans at the time of Building Permit issuance <br />26. City streets are to be kept clear of dirt and debris at all times during construction. <br />Dust suppression and street cleaning must occur as directed by the Public Works <br />Inspector. <br />27. There are existing sewer and water mains within the footprint of the proposed <br />hotel/commercial buildings. These mains will need to be re-routed during the <br />instruction, process <br />28, An easement must be dedicated to the City of Everett for the rerouted public water <br />main. Easement shall he a minimum if 15 feet in width. <br />29 The regulations stated by the Assistant Fire Marshal, Brad Olson, in his memo <br />dotod June 29,1994, are hereby incnmorsted sr; conditions of approval <br />30. Construction or substantial progress toward construction of this project must be <br />undertaken within two years after final approval of the Shoreline Permit and <br />completed within five years. If the project has not been completed in this time span, <br />the Shoreline Permit will be reviewed by the Planning Department, who will either <br />extend the permit for one year or terminate the permi! <br />non- „1 need this 12.th day of August, 1994. <br />Jan Driscoll <br />Han:,�.n Examiner <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.