Laserfiche WebLink
APR-10-1996 11:50 BUMGARDNER ARCH <br />206 447 8194 P.01 <br />THE <br />RUMGAItDNER <br />ARCHITECTS <br />in SMWARr 6TPJV <br />5=TOa <br />sF.Arn E. WASY MON <br />9M01 <br />206 22Y1361 <br />FAX 106.H72194 <br />To: CTTY OF EVERETr PUBLIC WORKS <br />Building Division <br />3200 Cedar Street <br />Everett Washington 98201 <br />Attention: Date 10 April % <br />. , <br />iy,�ra6�$6:. <br />Proiecr SE Marina Hotel/The Inn at Port Gardner <br />copies: C. j: Ebert, harbor Mountain Development 206 258-9366 <br />SUBJECT: Shaft for Factory Built Fireplace Chimney. <br />Jeff: <br />We have factory built fireplaces and chimneys at the Hotel (3 story) and a question regarding <br />shaft construction around the chimneys. Is it required that the chimneys be enclosed in a one hour <br />shaft or does UBC: section 711.3 Special Provisions... Walls containing gas vents or <br />noncombustible piping..." exempt this requirement? <br />If it is required that the chimneys be enclosed in a one hour shaft and all the walls around the <br />chimneys are one hour construction except at the firebox, does this meet the requirement? See <br />diagram below: <br />e,rf I M N&N <br />WAIA. K �A <br />FtKEboX <br />(hank you for your help. <br />FROM hrC iSit) her Osn ' V l/ 4 , -- — <br />Pages, including this page: FAXEn on � \4AMED on: <br />1EMO <br />The gumgardner Architects <br />page 1 <br />TOTAL P.01 <br />