My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1716 W MARINE VIEW DR BASE FILE 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1716
>
BASE FILE
>
1716 W MARINE VIEW DR BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 10:52:08 AM
Creation date
2/27/2017 6:25:38 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1716
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enginn+e <br />Plmmcrs <br />Snrtryors <br />Reid Middleton, Inc <br />June21, 1995 <br />1903133n1Ave. IV. <br />File No. 24-93-016-006-01 <br />suite -VI <br />P.O. Box 6638 <br />Lynnwood, %VA <br />Mr. Kirk Brooks <br />980360638 <br />City of Everett <br />Public Services Division <br />Phone 206 T5-3434 <br />3200 Cedar Street <br />FAX 206775-3439 <br />Everett WA, 99201 <br />Subject: Port of Everett Southeast Marina Project <br />Dear Kirk, <br />Enclosed are three sets of prints of the above referenced project together with our response <br />to review comments for the purpose of acquiring the necessary building permits for the Port <br />of c�etett. Final easement ducumeui,, interlocal agreements, and permit fees will be <br />111*0vided directly by the Port of Everett. <br />The following information is provided in response to the city's review comments on the ^ ' <br />original submittals: <br />3 PRIL 3, 1995, MEMORANDUM FROM JANE ZIMMERMAN r PTV �t�kq(f <br />Interlocal agreements: <br />It is our understanding that these agreements are presently being negotiated between <br />.he City and the Port. A�ttft qw,}-S Si % I n-it-CCL-ct ILPI iat <br />�f/MI-� iS.wCv�7G2 , � ��J lyt.eMU. <br />twisting pipe data. <br />Corrections have been made to the underlying base map as noted. <br />ExiI ling pipes to be permanently underwater: <br />Presently these pipes are under water most o- the time due to tidal conditions. The <br />Port is aware that there will be increased maintenance due to sediment accumulation. <br />Additional tidal analysis: <br />Based on Corps of Engineer data, Mean Higher High Water at Everett is at elevation <br />1 I.11 ft. above MLLW. On " ebruary 5 1995, the water level at the east end of the <br />marina was measured at 14.2 feet MLLW at a predicted tide level of 11.6 feet <br />MLLW. Based on this difference which is caused by the river hydraulics, it is <br />estimated that the water level at the outfall in the marina would be above elevation <br />12.0 ft. MLLW, which is the system overflow, for an average of about three hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.