Laserfiche WebLink
Mr: Kirk Brooks <br />City of Everett <br />.June 21, 1995 <br />File No. 24-93-016-006-01 <br />Page 3 <br />C-x <br />Connections to be at developers expense. <br />Comment regarding cost of connections has been added to note 2. <br />Is this to be a city sewer main? <br />The existing gravity sewer is presently and has been a city sewer since its <br />construction. it is our presumption that this will continue to be a city sewer main. <br />Irrigation connection not shown. <br />There is no irrigation connection at this time <br />C-9 <br />Miscellaneous comments. <br />Base map corrections have been made. <br />Reference has been changed from 30" to 24. <br />E-1 <br />Show proposed storm drain <br />Proposed storm drain has been shown on sheet C-9. <br />Sincerely, <br />RE D MIDDLETON,, INC. <br />John O. Olsen, P.E. <br />Director of Engineering <br />bj r\wf\evt\tiemarina\pennit. joo <br />cc: Port of Everett, attention Dennis Gregoire <br />Enclosures: Mylar drawings C-1 through E-4 <br />Legal descriptions for easements <br />Engineers cost estimate <br />Fire marshals review comments <br />