My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1802
>
1802 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 6:34:40 PM
Creation date
2/27/2017 6:29:25 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1802
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. -7- <br />Strapping material should be cold-rolled, fully heat-treated, high tensile <br />steel, having a tensile strength of nat less than 5,000 paunds. Strapping of <br />this strength would have a cross section_of 0.031 by 1.25 inches. These <br />straps should be installed after treatment. <br />7he area around the pile cap should be backfilled with a relatively free <br />draining material. 7he onsite soils are not suitable for use as fill in this <br />area due to the high organic content of the soils. <br />CONS7RUL'TION OBSERYATIONS <br />� <br />We recommend that Converse Consultants NW abserve the pile installation to <br />evaluate whether the recommendatians of this report are followed and the <br />provisions in the construction plans and specifications are properly completed <br />during construction. Field actiyities should include the observation of pile <br />installation. We also recommend that we reevaluate our driving criteria once <br />the pile driving equipment and piles hav,:e been chosen. <br />USE OF THIS REPORT <br />We have prepared this report for the exclusive use of the Snohomish County <br />P.U.D. and their engineers for specific application in design of this project. <br />We recommend that this report be provided to prospective contractors for their <br />information. However, our report, conclusions and interpretations should not <br />be construed as a warranty of the subsurface conditions. <br />The findin9s and racommendations are based on results of the field <br />explorations and labo;•atory observations, combined with an interpolation of <br />soil conditions between exploration locations. Within the limitations of <br />scope, schedule and budget, the analyses, conclusions and recommendations <br />presented in this report were prepared in accordance with generally accepted ; <br />professional geotechnical engineering principles and practices in this area ; <br />at the time this report was prepared. We make no other warranty, either , <br />express ar implied. <br />�� c«,�„n�m riw <br />
The URL can be used to link to this page
Your browser does not support the video tag.