My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1802
>
1802 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 6:34:40 PM
Creation date
2/27/2017 6:29:25 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1802
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c ' � <br />�c�m�f 83�fifZ-I <br />Converse Consultants NW DAILY R�PORT <br />PROJECT: Snohomish Co. P,U.D. PROJECT NO. 91-35213-01 <br />Nor.ton P_venue Substation DAY: Thursday DATE: 09 APR 92 <br />TIME ON SITE: from 09:30 to 13:45 <br />WEATHER: mild (-50), overcast <br />RSPORT NO. 1 <br />PAGE 1�2 <br />BQIIIPM821'P SN IIBE: Truck-mounted crane, Vulcan o1 pile driving <br />hammer with fixed leads <br />Present on site - partial or full time: <br />Snohomish Co. P.U.D. - Jim Simpson, Bob Barr <br />American Construction Co. - Andy Emery (superintendent), Ed Doern <br />Solie (General Contractor) - Howard Spr3nger, Paul Solie <br />At the request of Bob Barr, I went to the site to observe driving <br />of piles to support the new circuit switcher. Before pile driving <br />started, I discussed the following with Bob, Ed, Howard, and Jim: <br />1. Job specifications state that the minimum pile tip circumference <br />should be 31 inches (1C-inch diameter). The soils report <br />recommended a minimum pile tip diameter of at least 7 inches, <br />Actual pile tip circumferences were 29 and 26 inches (9-inch and <br />8-inch diameter). This was acceptable to Snohomish P.U.D.. <br />2. WSDOT specifications state that timber piles should be banded, <br />but the piles on site were not banded. Ed said he could band the <br />piles, but fei`. it was not r.ecessary for the anticipated driving <br />conditions. It was acceptable to Snohomish P.U.D. to drive the <br />piles unbanded. <br />3. Job specifications called for Mc�-2 piles (marine piles), but the <br />piles were not marked as such. Ed provided Bob with <br />certification that the piles were MP-2. <br />Pile drivino began about 12:30. Piles were driven from the bottom <br />of the pile cap excavatiot�, which was about 3 feet deep, <br />corresponding to about Elevation 16 feet. Both piles were driven <br />to about depth 22.3 feet, correspond?ng to Elevation -6.3 feet. <br />For the final full foot of penetration, allowable capacities of 42 <br />Canversc Conwlfants NW � <br />
The URL can be used to link to this page
Your browser does not support the video tag.