Laserfiche WebLink
Norton Avenue Substation <br />Thursday o9 April 19g2 <br />Daily �teport No <br />91-35213-01 <br />' 1 Paqe 2�2 <br />cons (north pile) and 37 tons (souch pile <br />accordance with Section 6-05.3(2)F of t <br />specifications. � Were calculated in <br />he WSDOT Standard <br />After each pile was driven <br />No heave of the first pile�drivenswastnot d <br />second pile had been com at �%levation 17.5 feet. <br />pleted, after driving of the <br />It was our opinion that the piles were properly installed <br />adequate to support the design loads. <br />, and <br />Attached are field pile drivi.ng records and a <br />installations. <br />summaXy of pile <br />e17C1: <br />BY: U�' "w' �.'� ���w <br />field pile driving records ` <br />summary op pile ihstallations. <br />�O^"� �w�a Nw <br />•�. <br />