Laserfiche WebLink
� <br />�� `� �� �Q ," ��f � incorporat�d <br />i� �� <br />v �-��� <br />ETI REEERENCE N0. 3084259 <br />CUSTOMER ORDER N0. 5370 JOB 5769 <br />CLIENT: SEVEN SISTERS <br />P.O. BOX 719 <br />SEDRO WOOLEY, WA. 98284 <br />� • :•• �l <br />Pacific Norlhwest <br />HEGIONAL OFFICE <br />150° 130TVi AVENUE, N.E. <br />OELLEVUE, WA 9�005 <br />1206) d55�5367 <br />DATE: NUVRMBER 6� 1984 <br />SITE: PORT OF EVERETT <br />MODULE SITE _— <br />�922 MAP.INE VIEW <br />RIVE <br />The purpose of ground fault system field test is to insure that <br />ground protective equipment as requiced by NEC 230-95 is installed <br />properly and is operational. These tests ace required by N1:C <br />230-95(c). <br />2.0 �4J�18B� <br />The testing was performed by Jim Honeycutt and Bab wilson on November <br />6, 1984. <br />o The system at: panel #2, Cast end of warehouse, was found opeca- <br />tional and acceptable. <br />o The system at panel �1, West end of warehouse is conditionally <br />acceptable upon fulfillment of items list��d in result Section <br />4.0. <br />1 '`• 1 �_ <br />3.1 Visual and Mechanical Inspection <br />3.1.1 Inspection was made Lor physical damage and compliance <br />with plana and specifications. <br />3.1.2 The neutral main bonding connection was inspected to <br />assute: <br />o Zero sequence system is grounded upstream of sensor.. <br />o Ground Strap systems are grounded thcough sensing <br />device. <br />o Ground connection i.s made ahead of neutral disconnect <br />link. <br />� <br />�. <br />r: <br />Hr <br />H ' <br />ri . <br />U1 ' <br />O� <br />�S <br />f <br />� <br />�F <br />V � <br />� ' <br />r <br />b : <br />C <br />F: <br />�, <br />�' <br />�; <br />Y <br />r, <br />� <br />