My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1922
>
1922 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 9:53:30 PM
Creation date
2/27/2017 6:29:30 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1922
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />��� ��((� ;'' �(�f � incorporotc�d <br />. ��b.� ,. , . ..� •.,� i � �.i..� . . ... '.�i ,�.iii,:,.l P . , �. �m, <br />� <br />�� �� a � ��� <br />ETI REFERENCE N0. 3084259 <br />CUSTOM�R ORDER N0. 5370 JOB 5769 <br />CLIENT: SEVEN SISTERS <br />P.O. SOX 719 <br />SEDRO WOOLEY� WA. 98284 <br />� • ;•• <br />DATE: <br />Pacitic Northwest <br />REGIONAL OFFICE <br />1509 130TH AVENUE. N.E. <br />BELLEVUE, WA 9P005 <br />(206) 455�5367 <br />� <br />1984 <br />: PORT OF EVERETT <br />MODULE SITE <br />1922 MARINE VIEW <br />DRIVE , <br />The purpose of ground fault system field test is to insure that <br />ground protective equfpment as required by NEC 230-95 is installed <br />properly ai.d is operational. These tests ate requited by NEC <br />230-95(c). <br />i ��::_ <br />The testing was performed by Jim Honeycutt and Bob Wilson on November <br />6, 1984. <br />o The system at panel #2, East end of warehouse, was found opera- <br />tional and acceptable. <br />o The system at panel #1, West end of warehouse is conditionally <br />acceptable upon fulfillment of items listed in result Section <br />4.0. <br />� •;• � ��l <br />3.1 Visual and Mechanical inspection <br />3.1.1 Inspection was made for physical damage and compliance <br />with plans and apecifications. <br />3.1.2 The neutral main bonding connection was inspected to <br />assure: <br />o Zero sequence system is qcounded upst�eam of sensor. <br />o Ground Strap systems are grounded through sensing <br />device. <br />o Ground connection is made ahead of neutral disconnect <br />link. <br />;,;a ,� i ��s • snrv i'r�nrias: o • <br />s�s��r�e . � orl;! nNc <br />urwvt_!a • . <br />
The URL can be used to link to this page
Your browser does not support the video tag.