Laserfiche WebLink
ATTACHr�NT N0. 1 <br />Chan es in Environmental Checl<list for Parson's <br />Constructors [nc. from Preliminar Checklist <br />Circulated 5 27' <br />I-5 Name of proposed changed to "Everett :vtodule Fabication Site" <br />In Preliminary Checklist it was called "Alaska Ga; Conditioning Facilities - <br />Everett Fab Site" <br />I-8 Estimated date for completion changed form August 1984 to Aug�st 1586. <br />I-11 Cha�ged to yes - Port of Everett, pending application for portion of river <br />frontage. <br />fI-17 Human Health -"no" changed to "rnaybe" <br />� See Changes to Attachment 2 <br />Chan es in Attachment 1 to Environmental Checkiist <br />p. L size of modules description changed to: (some weighing �,000 tons and with <br />typical dimensions of 50 feet x 150 feet, wiih a inaximum height 85 feet) <br />from ... and with maximum dimensions of 48' x 165' x 175') <br />Chan es in Attachment 2 to Environmental Checklist <br />p. 2 11 and l2, number of workers at peak changed to 1500 from 1000. <br />� p, 3 17, new response "This project involves job-related hazards and risks typical of <br />large building erection, construction and assembty:' <br />