Laserfiche WebLink
� <br />4� <br />ru <br />PORT OF EVERETT SECTION 01010 <br />BAYWOOD AT PRESTON PO[NT SITE PREPARATION SUMMARY OF THB WORK <br />�•3 WURK UNDER OTHER CONTRACTS <br />"' Unitecl States Army Corps of Engineers will use area within the constn�cted dike to depotiit <br />hydraulic dredge material from the Snohomish River. Project Manager is �firam Arden, <br />telephune number 764-3401. Anticipated date for award of bid is mid-September 1995. <br />1.4 WORK SEQUENCE <br />Comple[e Base Bid Work prior to MILESTONE I per Article 3 of the Agreement form. <br />PART2 PRODUCTS <br />NOT USED <br />PART 3 EXECUTION <br />NOT USED <br />,.� <br />END OF SECTION <br />010(0-2 <br />