Laserfiche WebLink
n <br />,; <br />PORT OF EVERETT SECTION O15C� <br />� BAYWOOD AT PRESTON POINT SITE PREPARATION CONSTRUCTION FACILIT[ES <br />AND TEMPORARY <br />CONTROLS UTILITIES <br />B. Vrovide barricades and walkways requirecl by governing authorities for public <br />rights-of-way. <br />C. Protect non-owned vehicular traffic, srorecl materixls, site and structures from dumage. <br />1.7 FENC[NG <br />A. <br />B. <br />� i.x <br />A. <br />B. <br />I.y <br />A. <br />1.10 <br />A. <br />I.11 <br />Consvucuan: Coimnerciul grade chain link fence. <br />Maintain existing fences and gates. <br />PROTECTION OF INSTALLED WORK <br />Protect installed work and provide special protection where specified in individual <br />specification sections. <br />Provide temporary and removable protection for installed products. Conaol activity in <br />inuneciiate work azea to minimize da�nage. <br />3ECURITY <br />Coordinate security requirements with PORT. Contractor to provide securiry and faciliucs <br />to protect work and construction storage. <br />ACCESS ROADS <br />Provide and maintain access roads required for execution of the work.. <br />PARKING <br />A. When site space is not adequate, provide additional off-site pazking. <br />1.12 PROGRESS CLEANING <br />A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and <br />orderly condition. <br />B. Remove waste materials, debris, and rubbish from site periodically and dispose off-site. <br />01500-2 <br />