My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
200 W MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
200
>
200 W MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 6:24:28 AM
Creation date
2/27/2017 6:29:50 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
200
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-i <br />PORT Of EVERETT <br />`� BAYWOOD AT PRESTON PO1NT SITE PREPARATION <br />SGCTION o1500 <br />CONS'fRUCTION FACILITIE3 <br />AND TGMPORARY <br />CONTROLS UTILII'IES <br />Keep Ciry streets clean. No flushing or washing shall be allowed. <br />DUST AND EMISSIONS CONTROL <br />Execute work by methocls to minimize raising dust from consvuction operations. <br />Provide positive means to prevent air-borne dust fiom dispersing into atmospliere. <br />Minimize emissions from operating consWction eyuipment in accurdance with Shoreline <br />Management Pennit Number SMA#1-95. <br />NOISE CONTROL <br />A. GeneraL• The Contractor shall conduct all his work, use appropriate construction methods <br />and equipment, and furnish and install acousrical barriers, all ac necessary so that no noise <br />emanadng from the process or any related tool or equipment will exceed legal noise levels <br />detennined by appropriate agencies. <br />B. Night time Work: [f the Contractor desires to perform any work outside of normal <br />worl:ing hours, Contractor shall obtain all necessazy permits from the appropriate agencies <br />and make all necessazy arrangements prior to commencing. <br />C. Mitigation of Construction Noise Impact: The Contracror shall submit to the Engineer his <br />plans to mitigate the construction noise impacts, including the method of construction, the <br />equipment to be used, and acoustical treatments if necessary. <br />D. Shoreline Management Permit: Comply with terms and conditions of pennit Number <br />SMA#1-95. <br />PART2-PRODUCTS <br />Not Used <br />PART 3 - EXECUTION <br />Not Used <br />END OF SECT'.ON <br />01500-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.