Laserfiche WebLink
8. List any environmental information ,you know, about that has been prepared, or will be prepared, directly related to <br />tr' <br />this proposal. <br />tZJ <br />o <br />None <br />C H <br />9Hrn <br />ryxy <br />H Y� <br />HtZ <br />9. Do ,you know whether applications are pending for governmental apprcvals of ocher proposals directly affecting the <br />0 H0 <br />property covered by your proposal? if yes, explain. <br />En H <br />H t" <br />tb <br />No <br />O H �vy <br />M <br />10. List any goverment approvals or permits that will be needed for your proposal, if k:iown. <br />cOa <br />7 H 3 <br />H Z <br />Building permit from City of Everett <br />HH <br />gy H <br />Z H rn <br />H O rn <br />-- <br />11. Give brief. complete description of your propesa., including the proposed uses and the size of the project and site. <br />T'nere are several questions later in this checklist that ask you to describe certain aspects of your proposa'. You do not <br />need {p repeat these answers on this page. <br />Construct an 1800 S.F. warehouse addition to the existing building, <br />I_ •r <br />C ; <br />� v <br />12. Location of the proposal. Give sufficient information for a person to understand the prw.se location of your pro- <br />posed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur <br />»� over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, <br />and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not <br />required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. <br />930 W. Marine View Drive <br />I� <br />a Z TO BE COK. LETED BY APPLICANT <br />b. ENVIRONMENTAL ELEMENTS <br />I. Earth <br />a. General description of the site (circle one): Flat. rolling, hilly, steep slopes, mountainous, <br />other <br />b. What is the steepest slope on the site (approximate percent slope)? <br />None <br />2. <br />I <br />EVALUATION FOR <br />AGENCY USE ONLY <br />