My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
930 W MARINE VIEW DR 2018-01-02 MF Import
>
Address Records
>
W MARINE VIEW DR
>
930
>
930 W MARINE VIEW DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 2:53:17 PM
Creation date
2/27/2017 6:40:16 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
930
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MVh <br />a <br />TO 1E COMPLETED 31' APPLICANT <br />,O 17 x <br />Cy" En <br />aHv1 <br />H Z <br />c. What general types of soils are found on the site (for example, clay, sand, gravel, peat. <br />H Fa <br />muck)'? If you know the classification of agricultural soils, specify them and note any prime <br />y = <br />farmland. <br />H'iJ <br />C4H <br />sandy gravelly <br />0 H�y <br />fH.,t M <br />d. Are there surface indications or history of unstable soils in the immediate vicinity? If so. <br />describe. <br />n Y ca <br />HI <br />No <br />H H <br />En <br />H <br />p En <br />Describe <br />e. Describe the purpose, type, and approximate quantities of any filling or grading pro- <br />r <br />Indicate source of till. <br />H to <br />H OW <br />None <br />f. Could erosion occur as a result of c!earing, construction, or use? If so, generally describe. <br />No. <br />� � <br />P <br />g. About what percent of the site will be covered with impervious surfaces after project <br />construction (for example, asphalt or buildings)? <br />Building addition will occupy space that is now paved <br />+ <br />storage yard. <br />It. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: <br />None <br />1� <br />,1 1 <br />?. Air <br />a. What types of emissions to the air would result from the proposal (i.e.. dust, automobile, <br />odors, industrial wood smoke) during construction and when the project is completed? If <br />any, generally describe and give approximate quantities if known. <br />(+1 During construction - minor dust f, equipment emissions <br />After construction - no emissions <br />b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, <br />generally describe. <br />No <br />c. Proposed measures to reduce or control emis_ions or other impacts to air, if any: <br />None <br />EVALUATION FOR <br />AGENCY USE ONLY <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.