My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7211 RAINIER DR BASE FILE 2018-01-01 MF Import
>
Address Records
>
RAINIER DR
>
7211
>
BASE FILE
>
7211 RAINIER DR BASE FILE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 3:44:43 PM
Creation date
2/27/2017 8:02:09 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER DR
Street Number
7211
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
road. Individual apartments must be clearly identified <br /> legible from the access road. <br /> so as co be visible and <br /> 41. Fire lanes shall be provided a, required in Everett Municipa► Code 46.44. <br /> Alanes shall be identified by red curbs with whit stenciling statin "N <br /> ��YZO" and vettical signs statin Fire <br /> �•" Location shall be approv d b p�K�C' � F� L� P�K�G - <br /> q2, y the Fire Marshal. `�E ' TOW <br /> The City ofEverett prohibits outdoor burnin . <br /> P��'pose of disposing of construction debris or rubbish will not be permitted. <br /> S Therefore, outdoor buming for the <br /> 43• Fire hydrants and access roads must be in service p��or to commencement of <br /> con�truction. <br /> 44. Dumpsters over 1.5 cubic yards capacity must be located a minimum of 5 Feet from <br /> the building ([�C � � ;���b� 1991 Edition) <br /> �'`� ' ' , 45. The Washin ton <br /> reasonabie g State Clean Air Act requires the use of <br /> during construction cN�tiesic�an be�c n�rlo�ll d b �ncludin ail known, available, and <br /> as areas oFexposed soils, washine ;ruck wheels before�heysleave thesl�erand <br /> y wetting those dust sources such <br /> installing and maintainins g�a'�el construction entrances. <br /> track-out is also a major cust source. Construction vehicle <br /> violations and fines from the Department of Ecolo <br /> ��Y e�idence of track-out can trigger <br /> Pollution Control Agency. <br /> 8y or the P�get Sound q�r <br /> 46. Comply with Revi:w Process (LC # I-92. <br /> GENERAL INFORMqT10N <br /> 1• GTE Northwest Inco <br /> telephone cable consrt�ruction will PbeV equired��in�conj nction with the site <br /> development. GTE's engineering will begin when �he H�WeVef, new <br /> construction schedules and telephone requirements. <br /> service, please provide 90 day lead time for engi ee�su e timelyaejephone <br /> instaliation of cable and equipment. Please contact <br /> Engineer, at 356-4052 should g� P�ocurement, and <br /> you require additional informathon� Hupf, Senior <br />
The URL can be used to link to this page
Your browser does not support the video tag.