Laserfiche WebLink
balcs and siltation icncing will bc placcd up and do���n stream of thc enhancemcnt arca whcrc <br /> thcy shall remain throu�hout thc cnlirc first wintcr and spring follo���ing crhancement work. <br /> In onlcr io mitigatc for thc rcduccd buffcrs along thc strcam channcl, thc appiicant has <br /> submittcd a I3uffcr Gnhanccmcnl Plan ���hich was preparod by �'Vetland Resour�es and is <br /> dated Scptember 13, 2000. Thc proposccl bufler cnhancement plan includes tlie remo��al and <br /> control of invasi��c spccics and pl�uning of nativc trccs and shnibs. r\long ���ith Ihis, all trasii <br /> and dcbris will bc remo�ed from tlm s�rcam and buffer arcas and disposed of in .ui appro��eJ <br /> locution. [3eforc planting, thc site ��ill bc graded to a 3:1 slope from the strcam to thc edgc of <br /> thc buflcc Oncc gr:�ding is compictc, 12" of silt loam topsoil, ���ith at least 30% organic <br /> maUcr. shali bc backfillcd o��er Ihc grudcd arca. \Qycorrhiral inoculum shall bc addcd at thc <br /> timc of planting to fLrthcr aid in thc cstablishmcnt of thc rcstoration plantings. Dctails of thc <br /> mycorrhizal inoculum arc pro��idcd in this plan. Wood chips, shavings, or bcauty Uark shall <br /> bc placcd around plantinLs as ntulch. <br /> \1'cstcrn hcmlock, Douglass I�ir, \1'csl�rn red ccdar, \'inc maplc, Rcd osicr dog�+�ood, <br /> Sno�vben•y and Oregon grape �vill be addcd to thc norlhcrn buffcc Thc dog«�ood �+�ill bc <br /> concentrated closcr to the edge of the stream, with the other species along the perimeter of <br /> thc huffcr arca. <br /> -l.l 'fhc Applicant shall utilizc a qualificd ���ctland spccialist to dcvclop and implcmcnt a plan <br /> ���hich spccifics rcyuircments for r�ca�•ation, Jrainagc, matcrials stock piling, soil <br /> rcplaccmcnt. and planlin�as. Implcmcntation ul thc consUuction plan will rcquirc a <br /> se��cn-slcp program: <br /> 0 1'reconstructim� meeting <br /> �? titakin� of buffcr :irc:is <br /> 0 Installalion uf temporar� crosion and sedimentation control mcasures <br /> 0 Clcarink :incl grubbiuk, ovcr-cxc:n•ation of buffer and milig:rii�u ca, stockpiling of <br /> soil malcrisls, and cont:iincd root- :ind secdstock �., <br /> 0 Repl:�ccmcnt af.euil m:itcri:�ls <br /> C Planlin� <br /> 0 Post consu�ucliou mcclin� <br /> -1? O���r a ti��c (5) ycar perio�l ti�llu��ing bul�cr cnhanc�mcnt and restoration. �cgctatiun shal) <br /> be munitored to delermine Ihe success o(the [3uffer Enhancement �4itigation Plan in <br /> mceting its go:ils and objecti�es. Speci(ic mcasurablc goals and perCorniance standards for <br /> ��cgctation in thc buflcr mitigation area occr tl,c li�c (�) ��car moniroring period includc: <br /> U Im usi�c, csotic and undcsirablc spcci�•s shall rcprcscnt Icss than tcn (101 perccnt co��cragc in <br /> thc rnhanrrd bulfcr and restorcdlcrc:+tcd ��ctl:ind arc:i. <br /> � <br />