Laserfiche WebLink
l ( <br /> Geotec6aicai Eng�i��eering Report • <br /> ' Lo�vell Shon Plac <br /> June 2, 1999 <br /> NCA File No. 259499 <br /> Page 12 <br /> crawl space. Sitr grading should be designed such thet all crawl space dreins have a minimum of 1 foot <br /> of fnll. <br /> Roof dowvspout drainpipes should not be connected fi the footing dnin sysoem. All roof downspoirt <br /> drains shonld be separately righNined to discharge. 71�e footing drsm system shwld have a minimvm oi <br /> 12 inches of vertical fall before it is connected to the roof drein system. We recommend that sufficiem <br /> cleanou� be installed at strategic locetions to allow for periodic m�lntenance of tbie foocing de�in end <br /> downspout drait�pipe system. <br /> A washed rock or pea gravel filled collector drain should be constivcttd arour.d the saaitary sewv vnult <br /> where the wL�er seepage was observed at the gtound surfece. ihis drain should be routed to the wetlwd <br /> arw. Other construction or pamenmt collector drains msy be needed wbete sitrfece watet is <br /> encouirtered. If the collector drain is locattd within the roedway, we recommend the use of Slter fnbric <br /> around the roek to teduce inflow of wil into the drain. <br /> USE OF THIS REPORT <br /> We have propazed this repart for The Tredway Corporation and their egents, for use in plannina end <br /> design of this project. The daia and report should be provided to pro�pecave contraewrs for their bidding <br /> and esdmating purposes, but ow report, conclusions and inttrpretatioos should not be construed as a <br /> wa�ranry of subsurface conditions. Final developmeM plaus were not available at the time this teport was <br /> proparcd. We recommend tfwt we be retained to roview the finel plans md provide additional desi� <br /> inpu; es necessary, prior to construction. Speeific areas that should be reviawed include ret4iniug wells, <br /> rockeries,and the detendon pond. <br /> The scope of our work does not include se[vices relaud to conshuction safety precautions, end our <br /> recommendations are uot intended to dircct the contractors' methods, techniques, aequences, or <br /> procedums, except as specifically described in our report for consideradon in design. Thero are possible <br /> vatiations in subsurfacz r.onditions. We recommend that project plenning include contingenclos in budget <br /> and schedule,should areas be found with condidons that very from tho�e described in this report. <br /> We recommend that wc E *etained to provide monitoring services for geotechnicel aspecYs of the work <br /> i <br /> during coasWction. As part of ow services,we would verify site conditions fonad during wnstruction, <br /> and compare them with the data obteined in our explorttdona and evaluate soil bearing during <br /> constntetion Jn the event that condiHons vary, we would provide mommendations as appropriate. We , <br /> NELSON-COWI4ETTE 6 ASSOCfATES, INC. <br /> .................................................................................... ...... ........ �//4 <br /> ... .............. <br />