9 <br /> Contract Time <br /> Original contract time of this project was for 210 calendar days. Change order 41 and <br /> 42 added seventy-three, (73), and fifty-one, (51)calendar days respectively to the <br /> contract. <br /> This change order adds one hundred and three, (103),additional calendar days to the <br /> contract time. The contract was considered substantially complete on Friday,January <br /> 27,2006. <br /> The issue of the failed insulation impacted the project time frame considerably as <br /> painting and electrical work within the Alum/Polymer Storage Building could not <br /> continue until the scaffolding, (required within the building to complete the ceiling <br /> insulation work), was removed. This insulation work delayed the electrical <br /> subcontractor's work into a different time zone then originally planned.The City of • <br /> Everett also affected change to the control panel that was not communicated to <br /> Systems Interface, which also resulted in project delay. <br /> The above additional cost of$10,000.00 constitutes all additional cost of any kind <br /> resulting from adding one hundred and three, (103),calendars days to the contract • <br /> time. <br /> A letter of substantial completion has been written for Friday, January 27, 2006. <br /> Once all items on the punch list are completed a letter of physical completion will be <br /> forwarded, along with a final estimate and final contract voucher for review and <br /> execution. <br /> • <br /> • <br /> Exhibit A 24 <br /> Page 4 of 4 <br />