. EXHIBIT A 2 <br /> SCOPE OF WORK <br /> 1_ Work to Be Performed <br /> 1. Review findings and recommendations contained within reports from previously <br /> conducted security assessments and studies. <br /> 2. Meet with Filtration Plant and Waste Water Plant personnel and other City <br /> representatives no more than four times to further define requirements for the security <br /> system improvements. <br /> 3. Conduct field surveys of site and buildings to determine exact locations of <br /> security devices and preferred methods of routing cabling, conduits and <br /> raceways. <br /> 4. Identify locations for security equipment backboards. <br /> 5. Prepare security device drawings showing type and location of security devices_ <br /> 6. Prepare infrastructure drawings showing security system raceway and back box <br /> requirements and power requirements. <br /> 7. Prepare detail drawings as needed to show special installation requirements. <br /> 8. Coordinate power requirements and conduit routing with plant maintenance staff. <br /> 9_ Prepare opinions of probable construction cost for security system equipment <br /> and infrastructure work. <br /> 10. Prepare technical specifications for security system equipment. <br /> 11. Prepare technical specifications for infrastructure work including conduit and <br /> back boxes. <br /> 12. Conduct not more than four review meetings with Filtration Plant personnel, <br /> Wastewater Treatment Plant personnel and other City representatives to review <br /> security system and infrastructure design. <br /> 13. Provide assistance at pre-bid conference. <br /> 14. Respond to technical questions from bidders and issue written clarifications and <br /> addendums as required_ <br /> 15. Assist City in reviewing and evaluating bid proposals. <br /> 16. Review contractor submittals and shop drawings. <br /> 17. Respond to contractor request-for-information (RFI) inquiries. <br /> 18. Make periodic visits to site to observe installation work. <br /> 19. Conduct final inspection of completed work. Prepare punch-list of deficiencies <br /> requiring correction. <br /> Page l0 of 12 5 <br />