Laserfiche WebLink
7 <br /> Mr.Kim Buike <br /> 06 January 2006 <br /> Page 4 <br /> Task 7: Shoreline Permit $2,544.00 <br /> 6.1 Shoreline Permit: HB&B will prepare a package with Port assistance for the City of <br /> Everett's Shoreline Permit application submittal. HB&B will also attend the city's <br /> application meeting if required. <br /> Park Sub Consultants: <br /> HB&B will coordinate the design work of PND Consulting Engineers (with J-Omega)regarding civil <br /> engineering,utility, stormwater drainage, and electrical design, as well as the cost estimates of improvements <br /> (See attached PND letter). <br /> PND: $23,000.00 <br /> Expenses: $400.00 <br /> Park Total: $57,573.00 <br /> Park Assumptions: <br /> The task items above are based on the following assumptions: <br /> 1) An accurate survey will be provided by the Port of Everett. <br /> 2) There are no contaminated soils on-site that will affect the construction of park improvements. <br /> 3) No fire lane or emergency vehicle loop is required through the park. <br /> 4) Land use approvals and permits will be taken care of by the Port of Everett. <br /> 5) This task item does not include construction administration. <br /> 6) This task item does not include design development of the picnic structures, play equipment, site <br /> furnishings, park lighting fixtures,jetty island kiosk, or restroom building remodel or plaza area. <br /> Project Total: $84,787.00 <br /> • <br /> 30 <br />