My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
2525
>
2525 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 11:54:57 AM
Creation date
2/27/2017 1:02:37 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br />From: Souheil Nasr <br />Sent: Monday, May 19, 2003 9:15 AM <br />To: Peter Camp; Kirk Brooks <br />Cc: Jim Miller, Jane Zimmerman; Dave Davis; Mark Sadler; Don Hallsson <br />Subje�t: R�: Everett School District Interlocal re Linc In Field <br />Peter and Kirk, <br />Our cost estimate for the sewer work is not to exceed $50,000, making the DisficPs portion of tha cost not to exceed <br />$25,000. At this point we feel very confident with our estimate which was prepared by Don Hallsson and reviewed by me. <br />I checked with Don and Mark Sadler and the work can be scheduled for completion by August 1 st if we get the <br />nod by June 1 st. <br />Please let me know if you need further information. <br />Thanks <br />Souheil Nasr, P.E. <br />Ciry of Everett, Public Works <br />(425) 257-7210 <br />(425) 257-88B2 (Fax) <br />snasr�ci.everett.wa.us <mailto:snasr�ci.everett.wa.us> <br />---•-Origlnal Messa9e--••- <br />From: Pe[er Camp <br />SenF Monday, May 19, 2003 B:55 Nd <br />To: Kirk BrookS <br />Cc: ]Im Mlller; 7ane Lmmerman; SouhHl Na�, Dave DaWs <br />Subjeet: RE: Everett Sthod Dlstrict Interlocal re Linmin Fleld <br />Kirk, <br />Thanks. <br />I would prefer NOT to put a cap in the document yet—I expect the District will ask for it. I would. I merely want us to be <br />ready to respond. <br />I am still waiting for a better !efinition of cost--this is even more important now that we will be doing the work with our own <br />forces. <br />I understand we now plan to do the work this summer; does that mean I can/should state the Sewer Project will be <br />complete by 12/31/20031 <br />Even if we do the work ourselves, is it true the scope of the work hasn't changed, i.e., the description of Sewer Project in <br />the recital is still correct7 <br />Peter Camp <br />Legnl Dept. <br />x 8624 <br />-•-•-Original Message----- <br />From: Kirk &ooks <br />Sent: Monday, May 19, 2003 7:54 AM <br />To: Peter Camp <br />Cc: ]im Miller; Jane Zimmerman; SouYeil NaQ, Dave Davis <br />Subject: RE: Everett School Distrid In[erlacal re Lintoln Field <br />/ <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.