Laserfiche WebLink
Kirk Brooks <br />To: Peter Camp <br />Cc: Paul McKee; Tim Tyler; Jane Zimmerman; Sou:ieil Nasr, Dave Davis <br />Subject: FW: possible interlocal agreement with Everelt School District <br />Peter, <br />The scope of our agreement with the 5chool district has ch,nge somewhat. Rather than the work being included in the <br />2004 Sewer project, the work will now be done by city force� (designed and installed) this summer. The School Districts <br />payment of one half will now be collected when the Sewer d��partment has determined what the actual cost will be. Please <br />proceed with the agreement in light of this new information. Let me know if there is anything else I can do. <br />Thanks. Kirk <br />•----Original Mess��e..�.. <br />From: Kirk &ooks <br />Sen4 ThursdaY, March 27, 2003 4:04 PM <br />To: Peter Camp <br />Ca ]ane 7Jmmerman; Jim Miller; Tim Tyler; Souheil Nasr <br />Subjec� RE: possible interlaal agreement with Everett School DlstriR <br />I will try to assist in this by answering as many of these questions as I can. <br />The interlocal agreement or for that mater, a letter of understanding may work, would be between; <br />The Everett School District 2 <br />Mike Gunn <br />Oirector of Facilities and Planning. <br />3715 Oakes Ave <br />Everett, Wa 98201 <br />City of Everett Public Works <br />Tom Thetford <br />Utilities Director <br />3200 Cedar St <br />Everett Wa 98201 <br />Project location <br />The City blo�h between Rockefeller Ave and Oakes Ave from 25th St to 26th St.( Lincoln Fieid ) <br />School District Proposal: <br />Redevelop existing grass play field with backstops, bieachers, drainage system, and an artificial turf playing surface. Work <br />to be done this coming summer. <br />Problem; <br />There is an old, undersized sewer main that runs north and south through the middle of this block. Any future repairs to <br />this line may require excavations in the turf area and disruption of game schedules. Not good for the City or the School <br />District. <br />Solution; <br />Reroute the sewer main. Intercept the Sewage flow at 25th St and constn�ct a new line East along 25th ;t and ce.^.^�ct tu <br />the 15" dia sewer main in the alley East of Oakes Ave. <br />Who does what; <br />� <br />3 <br />