Laserfiche WebLink
DYKEMAN �� <br />INSPfRING EVERYDAY SPACES <br />� � ������ ( � <br />OC7 2 8 2�03 <br />..�nrr.�,�.. <br />int..io, eu�qn <br />,�.��„a <br />Wcathcr i Sunny <br />Temperamre Range � <br />Conformance with Scheduie (+/-) I <br />WorA in Progress � Foundations at batting cagc <br />Present at Site <br />Copy To <br />Chirs Hardy - EPS <br />A. Gary O'Leary, Dykem�n <br />Tom Stcphenson & Greg Manin, Allicd <br />Adrian K& Davc H. - Dcsign 2426 <br />Toby Coenen - Dowl Engineers <br />Paul McKec and <br />Dennis Gableman - COE Public Works <br />OBSERVATIONS / DISCUSStONS: <br />Date / Time � 10-23-03 _ <br />Project Namc � Lincoln Field <br />Project Location � Everett. Washington <br />Project Numbcr � 2002-066 <br />Numbcr of Pages i <br />I. Reviewed south sewer connection - side sewcrs from west of site. Ciry of Everett needs cleanout in R.O.W. <br />where abandonment of pipe ends, north of side sewers. Dowl will prepare CO Drawing. General Contractor <br />advised not to complete sewer abandonment ponding distribation of CO Drawing. <br />2. North sewer stub connec[ion installed a•est of sewer by City sewer inspectors reviewed praposal to mroute sewer <br />to new location. No cost change proposed by General Contracror. Iandscape Architect suggested instaliing a <br />marker on top of manhole covcr for locating cover in futwe. Civil Engineer will prepare drawing of ageed <br />sewer connection. <br />3. Reviewed change proposal for retaining wall drain relocation along west side. General Contracror pmposed <br />modification by sketch. Civil Engineer reviewed and accepted revised drawing. Discussed filling weep holes. <br />Geneml Contractor to research material for filling from field side. Civil Eneineer rcquested dcainage fabric on <br />top of pea gravel drainage layer. <br />:1. Sprin[ h�r(submittal nearly all completa General Conhactor awaiting a few pieces. Advance copy was <br />provided at previous mecting from Owner to rcview color and dimension. Geneml Contractor plans to submi[ <br />10/24/03. Additional lines will be added for foul lines. <br />5. Landscapc Architect rcquested irrigation and landscape submittals. <br />G. Claritied door schedule. Hollo�v metal door frames and hardware submittals have been sent back to General <br />Contmctor. <br />7. Ph„ I- Retumed to Architect <br />PR#2 - Accepted <br />PRr3 - Rzvised breakdo�cn submitted ro architect w/u quantities. ^ <br />/ � <br />-- - _ _- -� — -- - <br />tel: 425.259.3161 ��as: 425.259.5242 www.dykeman.net � i716 West Mertne View Drlve Everett, WA 98201-2098 <br />