Laserfiche WebLink
P�o2 <br />� 1 <br />PRfW — QuesHoned — Offset posu for gates were as originally bid —No credit affered for flat bus and expansion <br />bolts. Gene21 Contractor will review with subcontractor. <br />PR#5 — Plumbers credit for heat trace is not acceptable. <br />PR�6 — Second conduit to gates is acceptable closcr to surface. General Contractor will idendfy deep conduiu. <br />8. General Contractor has yet to submit COP for pole base shift. <br />9. Architect has ordered metal samples for color selecHons. <br />10. Musco submittals are at CBG. <br />I I. Grade damaged by trucks will be removed and replaced. <br />12. Archirect will check on water proofing and graffiti stop. Subsequent review of tile indicated no submittal <br />received by Architect. <br />13. General Contractor requested clarification to respanse to RFI#2 Landscape Architect clarified connections for <br />water system. <br />14. General Contractor requesred L 1.6 drawing revised ro show drip irtigation. <br />15. Discussed repair of ADS pipe at east wall, Adrian suggested using 3034 pipe. General Contractor will use ADS <br />and make it slope to grade. <br />16. O��ner requested name of field leveling subcontractor. <br />BY <br />Oxoen4 <br />feL 425.259.3161 Jnz: 425.259.5242 � www,dykeman.ner 1718 We�t Marine View Ddve Eveten. WA 9d201-2098 <br />