Laserfiche WebLink
P�e: <br />� 1 <br />PR�4 — Questioned — Ofl'set posts for gates were az originally bid — No credit offered for flat bars and expansion <br />bolts. General Contractor will review with subcontractor. <br />PR�S — Plumbers credit for heat trace is not acceptable. <br />PR#6 — Second conduit to gates is acceptable closer to surCace. General Contractor will identiCy deep conduits. <br />8. General Contractor hac yet ro submit COP for pole base shiR. <br />9. Archirect has ordered metal samples for color selections. <br />10. Musco submittals are at CBG. <br />I I. Grade damaged by trucks will be removed aod replaced. <br />12. Architect will check on water proofing and graffiti stop. Subsequent rcview of flle indicatM no submtttal <br />received by Architect <br />f 3. General Contractor requested clarification to response to RF[iF2 Landscape Architect clarified connections for <br />water system. <br />14. General Contractor requested L 1.6 drawing revised to show drip irrigation. <br />I5. Discussed repair of ADS pipe at east wall, Adrian suggested using 3034 pipe. Gener,�l Contractor will use ADS <br />and make it slope to grade. <br />16. Owner requested name of field leveling subcontr: -tor. <br />BY <br />o�....i: <br />Z�L <br />_ --. . __ _ � <br />fel: 42"s.259.3IR1^ faz: 425.259.5242 � wurw.dykeman.net 1716 Wert Marine View Drive Everctt, WA 98201•2058 <br />