My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 ROCKEFELLER AVE 2016-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
2525
>
2525 ROCKEFELLER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2017 11:54:57 AM
Creation date
2/27/2017 1:02:37 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYKEMAN �� <br />IYSPfIIIKG EVERYDAYSPACES <br />�� ��C�O��� n <br />� <br />OCT 2 9 2003 <br />•rohiucture <br />inft�tor dul(n <br />p�.���.s <br />Wenther � Sunny <br />Temperamre Range � <br />Conformancc with Schedule (+/-) I <br />N'orA in Progress � Foundations at batting cagc <br />Prescnt at Site <br />Copy To <br />Chirs Hnrdy - EPS <br />A. Gary O'Lcary, Dykcman <br />1'om Siephenson & Greg Martin, Allied <br />Adrian K& Davc H. - Design 2426 <br />Toby Coencn - Dowi Enginccrs <br />Paui McKce and <br />Dennis Gablcman — COE Public WorAs <br />OP3ERVATIONS / DISCUSSIONS: <br />Datc / Time <br />Project Name <br />10-23-03 <br />Lincoln Field <br />Project Location � Everctt, Washington <br />Proiect Number i 2002-06u <br />Number of Pagcs � <br />l. Reviewed south sewer conncction — side sewers from west of sitc. City of Everett needs cleanout in R.O. W. <br />where abandonment of pipe ends, north of side sewers. Dowl will prepare CO Drawing. General Contractor <br />advised not to complcte sewer abandonment ponding distribution of CO Drawing. <br />2. North sewer stub connection installed west of scwer by City sewer inspectors rcviewed proposal to reroute sewer <br />to new location. No cost change proposed by General Con[ractor. Landscape Archirect suggested installing a <br />marker on top of manhole cover for locating cover in fuwre. Civil Engineer will prepare drawing of a�eed <br />sewerconnection. <br />3. Revicwed change proposal for retaining wall drain relocation along west side. General Contracror proposed <br />modification by sketch. Civil Engineer reviewed and accepted revised drawing. Discussed filling weep holes. <br />General Contractor to research material for filling (rom field side. Civil Engineer requestcJ drainage fabric on <br />top of pea gravel drainage layer. <br />.!. Sprint mrf submittal ncarly all completc. General Contrac�or awaitine a few picces. Advance copy was <br />provided at previous meeting (rom Ouner to rcvicw color and dimension. General Contractor plans to submi: <br />10/24%03. Additional lines will be addcd far foul lines. <br />5. Landscape Architect requcsied irrigation and landscape submittals. <br />6. Clarified door schedule. Hullow metal door frames and hardware submittals have becn sent back to General <br />Contractor. <br />7. PRri 1— Retumed to Architect <br />PR�2 — Accepted <br />PR�3 — Revised breakdo�m submitted to architect ��/o quantities. <br />�IL <br />fel: 425.259.3161 � fas: 425.2595242 u�ww.dykcman.ner 1 i I6 Weat Marine Vlew Ddce Everctt, WA 98201•2098 <br />
The URL can be used to link to this page
Your browser does not support the video tag.