Laserfiche WebLink
Kirk Brooks <br />From: Kirk Brooks <br />Sent: Friday, April 25, 2003 8:42 AM <br />To: Peter Camp <br />Cc: Paul McKee; Tim Tyler; Jaiie Zimmertnan; Souheil Nasr, Dave Davis <br />Subject: FW: possible ir,terlocal agreement with Everelt School District <br />Peter, <br />The scope of our agreement with the School district has change somewhat. Rather than the work being included in the <br />2004 Sewer project, the work will now be done by city forces (designed and installed) this summer. The Scfiool Districts <br />payment of one half will now be collected when the S2wer department has determined what the actual cost will be. Please <br />proceeA with the agreement in light of this new information. Let me know if there is anything else I can do <br />Thanks. Kirk <br />----Original Message----- <br />From: Kirk Brooks <br />Sentr Thursday, March 27, 2003 4:04 PM <br />To: Peter Camp <br />Cc: Jane Zimmerman; Jim MIIIer; llm Tyler; Souhell Nasr <br />Subject: RE: possible InMrlaal agreemen[ with Everett School Distritt <br />I will try to assist in this by answering as many of these �uestions as I can. <br />The interlocal agreement or for that mater, a letter of understanding may work, would be between; <br />The Everett School District 2 <br />Mike Gunn <br />Director of Facilities and Planning. <br />3715 Oakes Ave <br />Everett, Wa 98201 <br />City of Everett Public Works <br />Tom Thetford <br />Utilities Director <br />3200 Cedar St <br />Everett Wa 98201 <br />Project location <br />The Ciry biock between Rockefeller Ave and Oakes Ave fron 25th St to 26th St.( Lincoln Field ) <br />School District Proposal: <br />Redevelop existing grass play field with backstops, bleachers, drainage system, and an artificial turf playing surtace. Work <br />to be done this coming summer. <br />Problem; <br />There is an o!d, undersized sewer main that runs north and south through the middle of this block. Any future repairs to <br />this line may require excavations in the turf area and disruption of game schedules. Not goud for the City or the School <br />District. <br />Solution; <br />Reroute the sewer main. Intercept the Sewage flow at 25th St and construct a new line East along 25th st and connect to <br />the 15" dia sewer main in the alley East of Oakes Ave. <br />/ <br />� <br />3 <br />