My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2604 ROCKEFELLER AVE 2018-01-01 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
2604
>
2604 ROCKEFELLER AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 3:45:10 PM
Creation date
2/27/2017 1:04:42 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2604
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James L. Barnes, Architect <br />August 10, 1981 <br />Pa�e Two <br />b. Patching of the roadways will be as follou�s: <br />l. No open cuts will bc left over night. <br />2. 6ackfill oi the treno s�vill be ���ith 5/8" crushed surfac3ng <br />compacted in 12 [nch ilfts. Areas with concrete paving <br />will be capped In kind to match existing conditions and <br />paved with 3" Class "B" asphalt. Areas without cana•ete <br />paving will be f:iled to subgrade, per previous directlons <br />and paved to mntch existing roadway thickness. <br />3. Temporary patches will be made a•ith cold patcli, compacted <br />and rolled, with a minimum 3 ton roller. <br />c. Miscellaneous. In the case where the conduit is crossing an <br />existing utility, a separatior of 1" will be required. 7'here <br />will be required a nonorganic separator between tlie 'wo utilities. <br />The separator unit wil! be approved by the City Inspector, <br />4. WATER - indicate size and location of ���ater services. <br />5. RIGHT-OF-K`AY - No private utilitles or equipment is allowed in the right-of-way, <br />l.e, 4" sewer lines on the N.W. corner of the building, ali piping. <br />6. PARKING - 3�} <br />a. Presently, as many as �t veliicles are parked daily on the construction <br />site; provide informat3on indlcating how these vehides will <br />impact the parking requIrement of the proposed building. <br />b. Provlde landscaped parking delineators on cach corner as shown <br />on the review plan. <br />c. Wheel stops on the south property line stiall be arranged to <br />llmit thc veliides irom crossing property lfne. <br />d. Provide an exii only sign at the Rockefeller Street access. <br />e. Secure wheel stops �vith an epoxy �rout. <br />7. STORM 1i�ATE� SYSTEM <br />a. Parking lot, Rockefeller side, how does the basin connect to <br />the public system. <br />b. Connect all downspouts to the storm water system. <br />c. Oil separators are required at each catcl� basin that emptles <br />into the public system. <br />S. SANITARY SEWER S1'ST[il <br />a. Install a Type I manho!e with eccentric top at the end of the <br />sewer run, as shown. [ndicatc all pipe in the rlght-of-�uay <br />wlll be concrete. A G" cleanout will be installed at the pro�rty <br />line of each connection to the public system. <br />b. M(nimum size plpe alluwed in rlght-of-way is 6" concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.