Laserfiche WebLink
� <br />:: <br />; <br />, <br />e <br />X <br />BIIILDINfi PERMIT INFORMATION <br />• r �i�1���7�d <br />UBC 1988 <br />UMC 1988 <br />UPC 1988 <br />NEC 1988 <br />ADMINISTRATIVE <br />Plan Reviews - become void if the permit is not issued within 180 <br />days. <br />Permits - become void if construction is not started within 180 days <br />or construction ceases for 180 days. <br />Special Inspection - may be required on certain phases of some <br />construction. This will be noted on your approved plans. Qualified <br />persons must be employed by the owner to provide additional <br />inspection services. <br />Requirecl Inspections: <br />Building Foundation <br />Frame <br />Certificate of Insulation <br />Drywall Nailing <br />Final <br />Mech/Plmb <br />Electric <br />Ground <br />Rough-In <br />Final <br />Gas Piping <br />Temporary Power <br />Rough-In (Service) <br />Final <br />Repeated reinspections for identical corrections require a reinspection <br />fee. <br />Certificates of Occupancy (issued for Commercial Buildings) - require <br />Building Division, Public Works, Planning and Fire approval. <br />