Laserfiche WebLink
Auaust 9, 1963 <br />H PD-b0045 <br />City of Everett Buiidin5 Department <br />City Hall <br />Everett, Washington <br />Attaniion: Mr. Lawrence Erickson <br />Subject: Snohomish County Courthouse Addition <br />Gentlemen: <br />'Oth reference to our previous discussion, we, as Architects and Engineers for the <br />Snohomish County Commissiers for subject job, request permission to design and <br />on <br />subsagvently construct this buiidlIV wit'tn the followln,� deviatiar From your adopted <br />Building Code (Uniform Building Code, i961 Edition). <br />"In Section 503, paragraph d, Table 5-8 of the Uniform <br />Building Code, permit a 3 hour separation between Group D <br />and F-2 occupancy In lieu of the required 4 hour." <br />This change is requested in order that we may house both the jail facility and the <br />ssible under the <br />general office space in tho some sfruc�'ure•n` his rmiltad In auld not e4�aur separation wal I <br />existing code requirement, as no owe ings pss <br />(Section 503, c,l). <br />For your information, we add that the City of Seattle Building Code has recognlxed <br />this particular problem and has changed the occupancy separation to 3 hours. <br />Sincerely, <br />VAA gf VAGN A. ANDERSEN <br />cc: Snohomish County <br />Commissioners <br />