My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
PARKING GARAGE
>
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 9:44:16 AM
Creation date
2/27/2017 1:41:36 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�J <br />� <br />� <br />�i,'.,�':'�L: : `��";'i��Ot�.I;vC. <br />scismic loadin� conditions. Thc allowablc bcaring capacity is bascd on thc assumption that thc <br />subgradc preparation rccommcndations, �vhich arc discusscd in this rcport arc followed. \Vc <br />rccommcnd a minimum footing embcdmcnt of 24 inchcs bclou- thc lowcst adjaccnt gradc. Wc <br />also rccommcnd a minimum width of IS inchcs for continuous footi�gs and 2d inches for <br />column footings. <br />� Assuming compliance ���ith the recommendations in o.�r geotechnical rcport, ��•c anticipate that <br />static loading settlemcnts would bc 1 to 2 inches, with diffcrcntial settlemcnts bctween adjacent <br />� footings or ovcr a 20-foot span of continuous footing equal to about ha(f the rotal setUement. <br />OurJunc 3002 tcchnical memorandum included an original rccommendation of 12 ksf allowable <br />i bcaring capacity that coRespondcd to static loading sctticmcnts of about �/: to �/a inch. At thc <br />' rcqucst of Skilling Ward Magnusson Barkshirc, wc arc providing a highcr allowablc bcaiing <br />capacity ( lG ks�, which corresponds to higher anticipatcd static loading sctUcmcnts. <br />Thc nc�v pcdcstrian tunncl exr.wation may cncountcr fill from prcvious construction of thc <br />esisting Wnncl, Administration Building, or othcr facilitics, or from thc proposcd scwcr linc <br />installation or other utilitics benealh Oakes Avenuc. If thc hase of thc new Wnnel cxca��ation <br />cncountcrs fill, �vc rccommcnd an allowablc bcaring capaciry of about 3 ksL To achic��c thc 3 <br />ksf bcaring capaciry, wc recommend that thc upper 2d inches of cxposcd fill be denscly <br />comp:icicd to 95 ��crcent of it, �7odificd Proctor maxinttim dry dcnsity .md to a dcnsc, unyiclding <br />condition. <br />lf Ihc prup<�scd �Adminishation 13uildint� finish flourcic��ation rcmains at 14S fcct, thc building <br />will likcly rcquire support from :� combination of foundation typcs. Thc southwcst portion of the <br />building may require dccp foundations, such as drilled shafts or augcrcast pilcs bascd on thc <br />presence of deep, very loose fill encountercd in Uorino B-1 l. Based on borings B-7, B-8, B-12, <br />and B-12A, the rcmainder of thc building would likcly be foimded on relatively shallo�v spread <br />footings. Additional foundation rccommcndations for thc Achninistration I3uilding �vill bc <br />providcd oncc morc dcsign infonnation has becn cstablishcd. <br />10.5 Lateral Is'arth I'ressures for Permunenl 1Valls <br />Lateral carth pressures may act on buricd portions of the building walls. For buricd building <br />�valls that are :illo«�cd to move at Ieast 0.001 times the ���all hcight, we recommcnd that a static, <br />;�rti�r, latcral r:irth �,rcssurc hc uscd. Por huricd huildim� ��:ills that arc not allo��cd to movc <br />_ i-i-�����,a, ir,..e i,,,i, ��,i � 1- I-096-1-1-OOi <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.