My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
PARKING GARAGE
>
3000 ROCKEFELLER AVE PARKING GARAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 9:44:16 AM
Creation date
2/27/2017 1:41:36 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�'. :�i:iti�r�;,� s::�,�dll_SO^:, Ii�C. <br />2.0 SI'CI: ANU PROJI'sC'1' DGSCIiIP7'ION <br />"I�hc projcct location is shown on the Vicinity M�p, Figure 1. The proposcd Administration <br />13uilding and Garagc is boundcd by thc cxisting courthousc and Administration Building to thc <br />�+�est, Pacific Avcnuc to the south, Oakes Avenuc to thc east, and Wall Strect ro thc north. Tiic <br />proposcd footprints of thc strucwres are sho��m on thc Sitc and Exploration Plan, Figure 2. <br />Proposcd dcvclopmcnt includcs construction of an Adminislration Building addition and a new <br />undcrground parking garagc locatcd bencath a civic plaza (about 2.5 acres) that will becomc the <br />entrancc to thc campus. This work will rcquirc dcmolition of thc cxisting thrcc-story, concrctc <br />parking garage, the Ginni Stcvcns I Icaring Room with its basemcnt cafeteria, and thc <br />Administration Anncs Building. Thc utility infrasuuc[urc for thc existing County <br />Administration I3uilding is prescntly housed in thc basement of the existing parking garage and <br />will nccd to bc rclocatcd. <br />As pai�t of thc dc��clopment, a below-grade pcdcstrian tunncl for transporting inmates will bc <br />constnrcted bet���een the existing County Couilhouse �cest of lhe site and the proposed Justicc <br />Ccntcr cast of thc sitc (scc Pigurc 2). Thc tunncl may also bc uscd as a utility corridor to conncct <br />thc proposed Administration Building to thc central plant. Preliminarily, the tunncl iloor <br />elevations �vill vary from about 125 fcel under Oakcs A��enue to 135 (eet at the existing <br />r\dminisUation I3uilding (to match thc cxisting basement (loor elevation) and then up to IdS fect <br />at Rockcfcllcr Avcnuc. �Vc undcrst.l0(I lll:ll lI1C LUIIOCI lvill bc constructed using cut and covcr <br />lechniqucs. Thc tunncl will hc :ihout S fcet widc �vhcn finishcd, but ma}' hc cut about 12 to l4 <br />fcct ���idc during construction. <br />'1'hr �,round iloor of thc nc��� Achninisir:uion addition �� ill hc conncctcd to thc cxisting <br />:\dministration I3uii�ing and ���ill housc officcs and public hc.inng and mecting rooms. <br />CurrcnQy, the Administrcuion [3uilding addition finish floor clevation is anticip�ted to be <br />;ippro�imatcly 145 fcet. Ne understand that the design of the ncw Administration Building is <br />not yct undcnvay; ���c �� ill ��ro��idc ecotcchnic:�l rccommendations for thc building as an <br />addcndum to this rcport. <br />Thc parking garagc �� ill bc .ipprosimcucly 1 SO by 3?0 fect in �lan �vith sis Icvcls of parking and <br />approximately 10-foot 11oor-to-floon c�ights. The proposed �arage excavation �ti�ill have finish <br />Il�,�,r cle��a�i�,n� r:inain�_ from 7;.5 tu S3.$ fcct. <br />i i��, �. �: �.,. ,: �.., ���. � 1- I-(196 7a-011i <br />
The URL can be used to link to this page
Your browser does not support the video tag.