Laserfiche WebLink
ll <br />FINnL DECLARATION OF NON-SIGNIFICANCE <br />SEPA 1/ 2-33 <br />Performance guarantees are required tor curb, sidewa;k and fand,caping <br />improvements. <br />� 2• A one-year Guarantee is required on the public sidewalk, curb and site <br />landscapmg for an amount not less than 10`S of the cost ot construction and <br />shall run ior one year from the date of issuance oi the first Occupancy permit <br />for the project. <br />13. Construction of the offlce building will impact telephone service requirement; <br />in the area. A telepnone conduit must be provided from the building to the <br />property line, and sufficient area within the building must be provided ior <br />telephone termination. <br />i4. ,-� nigh pressure gas main exists on 32nd Strect. Prior to the initiation of any <br />construction activity, Washington Natural Gas shall be notified, and gas <br />facilities shal! be located and marked to insure :hat no damage to any gas <br />facilities occurs <iuring construction. <br />l5. Landscaping of the parking area must be provided in compliance with :oning <br />Code requiremen.s, and a minimum of a 5 foot wiae, 72 inch high tandscape <br />screen or solid fence must be provided along the north property line adiacent <br />to the parking area. <br />l6. Any outdoor garbage disposal area must be screened. <br />Proponent: Location of Proposal: <br />��ir. Don A. Bailey Northwest corner of 32nd Street �k Rockefeller <br />2615 W. Casino 1-A <br />Everett, WA 98204 <br />Lead A�ency: <br />Contact Person: <br />City of Everett Planning Department Receipt No. <br />Bob Landles Phone: 259-8731 File No. <br />This proposal has been determined not to have a significant adverse impact on the environment. <br />An Environrr�ental [mpac: Statement is not required under RCW 43.21C.030(2)(c). This decision <br />was made after review by the lead agency of a completed environmental checklist and other <br />information on file with the lead agency, This Declaration of Non-Significance is specifically <br />conditioned on compiiance with the conditions attached hereto which are incorporated by reference <br />as if fully set forth herein. <br />A fifteen day review period has elaps�d for this project and no adverse comments were received. <br />Responsible Official: <br />Title: <br />Dennis Derickson <br />Planning Director <br />Date: February 9, 1933 <br />Signature: //�,,.,�,,.: ,1�.��� <br />NOTE: This final Declaration of Non-Significance may be withdrawn in the event of significant <br />changes in this proposal, or :ailure to comply with the conditions upon which this Declaration <br />of Non-Significance is predicated. <br />� <br />� <br />� <br />f. <br />n <br />H � <br />y ,- <br />�� <br />�� <br />�F <br />�' <br />'q ; <br />� F. <br />�c <br />o' <br />�� <br />� <br />� <br />c <br />�- <br />